Project

General

Profile

Actions

action #73180

closed

[functional][y] test fails in snapper_cleanup_timeline

Added by JRivrain over 3 years ago. Updated over 3 years ago.

Status:
Resolved
Priority:
Normal
Target version:
SUSE QA - SLE 15 SP3
Start date:
2020-10-09
Due date:
% Done:

0%

Estimated time:

Description

Observation

Looks like in the current builds the system takes less disk space, so the test fails here https://github.com/os-autoinst/os-autoinst-distri-opensuse/blob/27bbc93c89d14fb6166a9324b4c47a190240f19c/tests/console/snapper_cleanup_timeline.pm#L68 as we are expecting to have more than 80 % of space filled.

The dd command in the test module is filling up the disk space so that it should be more than 80% full and then runs the timeline cleanup algorithm in order to verify if the created snapshot will be erased, as expected.

We should think of a way to improve this. One of the ideas is to pre-calculate 80% of the disk size.

openQA test in scenario sle-15-SP3-Online-x86_64-snapper_cleanup_timeline@64bit fails in
snapper_cleanup_timeline

Test suite description

Test configures snapper and verifies the snapper cleanup timeline algorithm functionality.

Reproducible

Fails since (at least) Build 54.1 (current job)

Expected result

Last good: 53.2 (or more recent)

Further details

Always latest result in this scenario: latest

Actions #1

Updated by syrianidou_sofia over 3 years ago

The dd command in the test module is filling up the disk space so that it's more than 80% full and then runs the timeline cleanup algorithm in order to verify if the created snapshot will be erased, as expected.

Actions #2

Updated by riafarov over 3 years ago

  • Project changed from openQA Tests to qe-yam
  • Category deleted (Bugs in existing tests)
  • Priority changed from Normal to High
  • Target version set to Milestone 33
Actions #3

Updated by JRivrain over 3 years ago

  • Description updated (diff)
Actions #4

Updated by JRivrain over 3 years ago

  • Description updated (diff)
Actions #5

Updated by JRivrain over 3 years ago

  • Description updated (diff)
Actions #6

Updated by riafarov over 3 years ago

  • Target version changed from Milestone 33 to SLE 15 SP3
Actions #7

Updated by riafarov over 3 years ago

  • Description updated (diff)
  • Status changed from New to Workable
  • Priority changed from High to Normal
Actions #8

Updated by syrianidou_sofia over 3 years ago

  • Status changed from Workable to In Progress
  • Assignee set to syrianidou_sofia
Actions #10

Updated by syrianidou_sofia over 3 years ago

  • Status changed from Feedback to Resolved
Actions

Also available in: Atom PDF