Project

General

Profile

Actions

action #56837

closed

[qam] test fails in lvm

Added by dzedro over 4 years ago. Updated over 4 years ago.

Status:
Resolved
Priority:
Normal
Assignee:
Category:
Bugs in existing tests
Target version:
-
Start date:
2019-11-04
Due date:
2019-11-08
% Done:

100%

Estimated time:
1.00 h
Difficulty:

Description

Observation

openQA test in scenario sle-15-SP1-Server-DVD-Updates-s390x-mau-filesystem@zkvm fails in
lvm

Test suite description

Run filesystem tests against aggregated test repo

Reproducible

Fails since (at least) Build 20190911-1

Expected result

Last good: (unknown) (or more recent)

Further details

Always latest result in this scenario: latest

Actions #1

Updated by pstivanin over 4 years ago

it seems like the 2nd disk is not present on s390x:

https://openqa.suse.de/tests/3347895#step/lvm/4

while on x64 it's there:

https://openqa.suse.de/tests/3347865#step/lvm/4

Actions #2

Updated by pstivanin over 4 years ago

  • Status changed from New to Feedback

As I'm not an s390x I have a question: is it possible to "plug and play" a 2nd disk on s390 like on x64 or must the disk be activated before it can be used?

Actions #3

Updated by mgriessmeier over 4 years ago

pstivanin wrote:

As I'm not an s390x I have a question: is it possible to "plug and play" a 2nd disk on s390 like on x64 or must the disk be activated before it can be used?

it is possible with dasd_configure to add a second disk during runtime - I will give you the details after lunch
but the guest needs to have a second disk configured in beforehand - I am not sure atm if this guest have it - will check

Actions #4

Updated by mgriessmeier over 4 years ago

so every of those guests have a second disk 0.0.0200 and you can activate it with "dasd_configure 0.0.0200 1" during runtime

Actions #5

Updated by pstivanin over 4 years ago

  • Due date set to 2019-11-08
  • Status changed from Feedback to In Progress
  • Start date changed from 2019-09-12 to 2019-11-04
  • Estimated time set to 2.00 h
Actions #6

Updated by pstivanin over 4 years ago

  • % Done changed from 0 to 100
  • Estimated time changed from 2.00 h to 1.00 h
Actions #7

Updated by pstivanin over 4 years ago

  • Status changed from In Progress to Resolved
Actions #8

Updated by szarate over 4 years ago

  • Status changed from Resolved to In Progress
Actions #9

Updated by pstivanin over 4 years ago

  • Status changed from In Progress to Resolved

PR merged

Actions

Also available in: Atom PDF