Project

General

Profile

Actions

action #104208

closed

[sle][security][sle15sp4][ibmtss] test logic for version_check is not correct.

Added by rfan1 over 2 years ago. Updated over 2 years ago.

Status:
Resolved
Priority:
High
Assignee:
Category:
Bugs in existing tests
Target version:
-
Start date:
2021-12-21
Due date:
% Done:

100%

Estimated time:
4.00 h
Difficulty:

Description

I saw the following error megs in autoinstall log.

let me enhance my code:

Argument "AF\0" isn't numeric in numeric lt (<) at sle/tests/security/ibmtss/version_check.pm line 23.
version_check::run(version_check=HASH(0xaaaadc59b720)) called at /usr/lib/os-autoinst/basetest.pm line 361
eval {...} called at /usr/lib/os-autoinst/basetest.pm line 355
basetest::runtest(version_check=HASH(0xaaaadc59b720)) called at /usr/lib/os-autoinst/autotest.pm line 372
eval {...} called at /usr/lib/os-autoinst/autotest.pm line 372
autotest::runalltests() called at /usr/lib/os-autoinst/autotest.pm line 242
eval {...} called at /usr/lib/os-autoinst/autotest.pm line 242
autotest::run_all() called at /usr/lib/os-autoinst/autotest.pm line 296
autotest::ANON(Mojo::IOLoop::ReadWriteProcess=HASH(0xaaaadcf81060)) called at /usr/lib/perl5/vendor_perl/5.26.1/Mojo/IOLoop/ReadWriteProcess.pm line 326
eval {...} called at /usr/lib/perl5/vendor_perl/5.26.1/Mojo/IOLoop/ReadWriteProcess.pm line 326
Mojo::IOLoop::ReadWriteProcess::_fork(Mojo::IOLoop::ReadWriteProcess=HASH(0xaaaadcf81060), CODE(0xaaaadc93c878)) called at /usr/lib/perl5/vendor_perl/5.26.1/Mojo/IOLoop/ReadWriteProcess.pm line 488
Mojo::IOLoop::ReadWriteProcess::start(Mojo::IOLoop::ReadWriteProcess=HASH(0xaaaadcf81060)) called at /usr/lib/os-autoinst/autotest.pm line 298
autotest::start_process() called at /usr/bin/isotovideo line 260
Argument "1.6.0" isn't numeric in numeric lt (<) at sle/tests/security/ibmtss/version_check.pm line 23.

Actions #2

Updated by rfan1 over 2 years ago

  • Status changed from New to In Progress
  • % Done changed from 0 to 20
Actions #3

Updated by rfan1 over 2 years ago

  • % Done changed from 20 to 70
  • Estimated time set to 4.00 h
Actions #4

Updated by rfan1 over 2 years ago

  • Status changed from In Progress to Feedback
  • % Done changed from 70 to 90

PR merged

Actions #5

Updated by rfan1 over 2 years ago

  • Status changed from Feedback to Resolved
  • % Done changed from 90 to 100
Actions

Also available in: Atom PDF